How much will you spend on a thermal fluid heating system for your facility?

25 Oct 2019

Unfortunately, there's no one-size-fits-all answer to this question. The overall cost of purchasing new equipment and implementing a new system will depend largely on a number of factors that vary for each different customer. While we can't tell you exactly what you should plan to spend, we can give you some information on what will impact the price of the equipment you purchase.

Read on to find out what factors will influence how much you will spend on thermal fluid heating equipment for your plant.Factors That Influence the Cost of an Industrial Thermal Fluid Heating System

IndustryThe industry that your company operates in will determine what type of equipment is necessary and, in some cases, the standards to which that equipment needs to be built. This, in turn, can impact the cost.

CustomizationWhen it comes to customization, thermal fluid heaters and other industrial heating system components are like most other products.If your facility requires a custom heating system solution or a piece of equipment built to your specifications, be prepared to pay a bit more than you would have to purchase a standard piece of equipment.

System Components Being PurchasedObviously, the quantity of equipment you are purchasing will impact the overall cost of your capital improvement project. If you're in the market for a single system component, the cost will be significantly less than if you're in the market for an entirely new industrial thermal heating system. Costs will vary depending on whether you're purchasing an entirely new system, retrofitting to accommodate existing system components or just replacing certain elements of the system you already have.

VendorWho you buy your equipment from will also impact the price you pay for a new industrial heating system or system components. Keep in mind that while the highest quality equipment may be more expensive up front, the durability and longevity of the system and its components may save you money in the long run.

It's also important to keep in mind that purchasing an entire system in one place can benefit you as well. In addition to simplifying the purchase process, buying a complete system in one place may help you to save money long term. 

Products Recommended
WNS series gas-fired (oil-fired) steam boiler 1-20 t/h
Pressure: 0.7-2 Mpa
SZS series gas-fired (oil-fired) hot water boiler 7-116 MW
Pressure: 1.0-1.6 Mpa
WNS series gas-fired (oil-fired) hot water boiler 0.7-14 MW
Pressure: 0.7-1.25 Mpa
SZS series gas-fired (oil-fired) steam boiler 10-100 t/h
Pressure: 2.5-9.8 Mpa
Success Stories
14 MW WNS condensing gas-fired boiler for university
14 MW WNS condensing gas-fired boiler for university Equipment: 3 sets of WNS14-1.0/115/70-Q, 2 sets of WNS6-1.0-Q
Capacity: 14 MW, 6 tph
30 tph steam boiler for starch plant
30 tph steam boiler for starch plant Equipment: condensing gas fired steam boiler
Capacity: 30 tph
2 tph WNS condensing gas-fired steam boiler for chemical industry
2 tph WNS condensing gas-fired steam boiler for chemical industry Equipment: WNS2-1.25-Q
Capacity: 2 tph
20 tph SZS condensing gas-fired steam boiler for paper industry
20 tph SZS condensing gas-fired steam boiler for paper industry Equipment: SZS20-2.5-Q
Capacity: 20 tph
Checking Order Quality Test Before Delivery Check Items When Packing Packaging And Transport
Get An Instant Quotation

For all inquiries, please fill in the form below (* are required) to send us a brief message, and we will get back to you as soon as possible.

Product:
* Email:
Tel:
Name:
Boiler fuel:
  • Gas
  • Oil
  • Biomass
  • Coal
  • Waste Heat
  • Other
Application:
  • Textile Industry
  • Central Heating
  • Food Plant
  • Power Plant
  • Chemical Industry
  • Waste Heat Recovery
  • AAC Block Plant
  • Hotel & Resort
  • CHP
  • Other